Expertise

Three disciplines, one subsurface decision. We describe the rock before we design the well that goes into it.

Subsurface projects fail for reasons that are already in the data — spread across the wrong documents. Our expertise is organised around the order in which the questions actually have to be answered: what is the reservoir, what do the measurements really tell us, and how should the well be built to match it.

The order matters

1

Describe the reservoir

Structural framework, continuity, rock types, seal capacity, stress and pressure. This is where the project is either possible or it is not.

2

Evaluate the wellbore — every well

Run the per-wellbore suite: logs, core, samples, tests. Reconcile them against each other, then across wells. Where they disagree is usually the most informative part of the study.

3

Design the well

Only now does completion design have boundary conditions: rate, pressure ceiling, conformance, materials and well count.

Two scales, two names

Wellbore formation evaluation is what we do at a single borehole: the logs, the core, the samples, the tests, and the interpretation of that one well — done while it is drilling and again once it is on.

Reservoir formation evaluation — sold as Reservoir Description & Evaluation — is what we do when that same suite of measurements exists across many wells and a geographic area, and has to be tied together with seismic, structure, seal, pressure and simulation into a single three-dimensional description.

The second contains the first. A reservoir evaluation is built from many wellbore formation evaluations; a wellbore formation evaluation, however good, is not a reservoir evaluation. We sell the reservoir evaluation, so the per-well formation work is included rather than added — and where a client needs only the single-well assessment, we do that too.

A word on vocabulary: the industry uses “formation evaluation” loosely, sometimes to include work at reservoir scale. On this site the term is always scale-specific — wellbore means one hole, reservoir means the whole rock volume.

Why we lead with the reservoir

Most injection projects are capitalised before they are described. A well test arrives, the number looks healthy, and the project re-labels itself feasible. Our view is that the well test is the smallest question in the sequence, and that answering the largest question first is what keeps a project financeable, permittable and insurable.

Reviewing a well test report?

We will tell you plainly what it establishes — and what it leaves untested.

Talk to a subsurface specialist